Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/05/2016 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 10/03/2016 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 10/03/2016 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | 1-stack dry, test plug leaking 2-too much moisture, remove dirt from around fittings 360 deg. per IPC/IRC |
|
| 09/29/2016 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* | |
| 09/29/2016 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | TOO MUCH MOISTURE IN SOIL MOISTURE ON PIPES RAIN RECALL WHEN DRY |
|
| 09/28/2016 | PLUMBING - ROUGH, SOIL | Denied | NEEDS A 10' TEST HEAD. |