Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
Permit Number - T16CM06538
Inspection Description - FIRE SPKLR - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/10/2018 | FIRE SPKLR - FINAL | Approved | ||
| 12/28/2017 | FIRE SPKLR - FINAL | Partial Approval | see all notes under sprink permit. PA only on room #102 and the hallway/corridor that serves that room. This was only done so they could get TCO. Main drain test 51-42-50. Harvey to consult with Ryan fire protection due to low numbers. Still needs a full walk through after all heads trimmed out. 1) waiting on updated calcs after backflows were added. 2) need knox fdc plug 3) label riser room door, "riser room" 4) need fire bell installed. 5) min 2" drain needs to be installed due to backflows. currently 1 1/4" 6) still need full sprink final. |
|
| 10/20/2017 | FIRE SPKLR - FINAL | Partial Approval | Per inspector JPD: see all notes under sprink permits. Certain areas partialed. | |
| 10/06/2017 | FIRE SPKLR - FINAL | Denied | General called in the wrong inspection. They were not ready. Advised them that they need to perform the flush prior to staking the riser. Advised that they need to have preesure for minimum of 2 hours prior to us arriving for fire sprinkler hydro. |