Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/08/2016 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 09/06/2016 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1- UNDER SLAB ROUGH PLUMBING IS OKAY. 2- SHALL PROVIDE A TWO WAY CLEAN OUT FOR THE THE 3" AND 2" BLDG.SEWER. 3- SHALL PROVIDE A GREEN COLOR TRACER WIRE FOR THE BLDG. SEWER. NOTE: THE TWO WAY CLEAN OUT LOCATED BY THE EXISTING BLDG. SEWER IS INSTALLED INCORRECTLY. THERE IS A DEAD SPACE BETWEEN THE COMBINATION TEE WYES. |