Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/26/2017 | BUILDING - FINAL | Approved | 1- CLEAR ELECTRIC DGC | |
| 04/20/2017 | BUILDING - FINAL | Denied | 1- THE INSTALLATION IS NOT PER THE APPROVED PLANS. THE 125 AMP LOAD CENTER IS MISSING. 2- PLANS CALL FOR A 60 AMP/2P CIRCUIT BREAKER AT THE SERVICE PANEL. |