Inspection Status: Partial Approval
Inspection History: ELECTRIC - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/19/2016 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
LEVEL #9 - PDU. OK TO ENERGIZE |
| 12/15/2016 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
PDU AT LEVEL #1: GL: 6/K.5 - OK TO ENERGIZE. |
| 11/29/2016 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
PDU AT LEVEL #8.2 - OK TO ENERGIZE. |
| 11/17/2016 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
LEVEL #4, AREA 4.3 (PDU) OK TO ENERGIZE |
| 11/02/2016 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
ELECTRIC PDU AT LEVEL 2.3. OK TO ENERGIZE. |
| 10/30/2016 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
PDU AT LEVEL 4 - OK TO ENERGIZE. |
| 10/23/2016 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
PDU #3 - OK TO ENERGIZE |
| 09/21/2016 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
RISER "B" IS OK TO ENERGIZE FOR TEMPORARY POWER; EPU TO TRANSFORMER |
| 09/19/2016 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
DISTRIBUTION BOARD CLEARED - GROUNDING SYSTEM IN PLACE - OK TO UNLOCK. |
| 09/15/2016 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
WITCH GEAR UNIT COMPLETE - GROUNDING NEEDS TO BE COMPLETED. |