Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T16CM05478
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/13/2017 | ELECTRIC - FINAL | Approved | ||
06/07/2017 | ELECTRIC - FINAL | Not ready for Inspection | cancelled | |
12/13/2016 | ELECTRIC - FINAL | Not ready for Inspection | no one on site gates locked | |
09/07/2016 | ELECTRIC - FINAL | Not ready for Inspection | 1- need bond bushing at main transformer 2-verify listing for 400a switch 3-label equipment disconnects 4-clean surfaces at grounding 5-ground conductor to gutter,not per plan and undersized, bond bushing jumper. |