Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/17/2017 | PLUMBING - INTERMEDIATE | Approved | ||
| 02/24/2017 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE A WATER TEST ON THE SYSTEM. 2- SHALL PROVIDE A DOUBLE FIXTURE FITTING FOR THE DOUBLE LAVATORY DRAINS. 3- SHALL STRAP DOWN THE PEX WATER LINES EVERY 4' 0" VERTICAL. 4- SHALL PROVIDE THE RQUIRED NAIL PLATES FOR THE TOP AND SOLE PLATES. 5- SHALL COMPLETE THE CLEAN OUT AT THE SHOWER. 6 SHALL INSTALL THE SHOWER DIVERTER. 7- SHALL REVOVE THE FERNCO COUPLING AND PROVIDE A SOLVENT WELD COUPLING. * |