Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2016 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 08/31/2016 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE A SAN TEE FOR THE TRAP ARM TO THE BIDET. A COMBINATION TEE WYE IS NOT APPROVED TO BE LOCATED IN A VERTICAL POSITION TO SERVE A TRAP ARM. THIS WILL PLACE THE OUTLET OF THE VENT BELOW THE CROWN OF THE TRAP. 2- RETEST THE SYSTEM. * |
|
| 08/30/2016 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE AN APPROVED COUPLING (ie MISSION COUPLING) WHERE THE NEW BLDG. DRAIN CONNECTS TO THE EXISTING BLDG. DRAIN. FERNCO COUPLINGS ARE APPROVED WITHIN THE STRUCTURE. 2- SHALL PROVIDE A VENT THAT RISES VERTICAL AT THE WATER CLOSET FOR THE WATER CLOSET. 3- SHALL PROVIDE A VENT THAT RISES VERICAL TO THE TRAP ARM FOR THE BIDET. 4- RE TEST THE DWV SYSTEM. * |