Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE RELOCATION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/26/2017 | ELECTRIC - SERVICE RELOCATION | Approved | IVRS - Inspection :* | |
| 01/09/2017 | ELECTRIC - SERVICE RELOCATION | Denied | PROVIDE TWO POINTS OF ATTACHMENT TO BUILDING. PROVIDE ROOF JACK AT ROOF BOND WATER PIPE MAST IS HIGHER THAN 3", REQUIRES TWO GUIDE WIRES FROM MAST TO ROOF |
|
| 01/06/2017 | ELECTRIC - SERVICE RELOCATION | Denied | IVRS - Inspection : There is no access to the site.| 920 * |
|
| 12/30/2016 | ELECTRIC - SERVICE RELOCATION | Denied | 1-only one ground wire per acorn lug 2-provide two points of attachment to building 3-remove paint and debris from piping at bonding clamps 4-provide address label at service panel 5-provide roof jack at riser penetration through roof 6-another failed inspection will require a re-fee |
|
| 12/29/2016 | ELECTRIC - SERVICE RELOCATION | Not ready for Inspection | 1-minimum riser size to be 2" 2-provide 2 points of attachment to building 3-bond gas and water |