Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2016 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/22/2016 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL PROVIDE A FULL SIZE T & P DRAIN, 1 INCH MINIMUM. 2- SHALL SEAL THE T & P WALL PENETRATION. 3- SHALL PROVIDE VERIFICATION OF THE EXPANSION TANK SIZE FOR THIS BOILER. 4- SHALL NOT PULD IN THE POWER CORDS INTO A POWER STRIP LOCATED ON THE FLOOR. * |