Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/25/2016 | PLUMBING - FINAL | Approved | Water softener drain connection to indirect waste receptor requires a one inch air-gap. Correct the slope and supports of condensate drains. |
|
| 10/21/2016 | PLUMBING - FINAL | Not ready for Inspection |