Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/20/2016 | PLUMBING - FINAL | Approved | ||
| 10/18/2016 | PLUMBING - FINAL | Not ready for Inspection | water softener drain conn requires a 1 inch air gap. Complete installation of exterior clean-outs. Seal threads of AAV , secure DW hose with clamp as high as possible. |