Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T16CM04296
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/05/2016 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 08/02/2016 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- THE DETAIL FOR THE ELECTRIC WATER HEATER PL.0/201 CALL OUT FOR A DRIP PAN AND DRAIN. 2- THE FIXTURE SCHEDULE CALLS OUT FOR 17 GAGE TUBULAR P-TRAPS W/CO. 3- SHALL LABEL ALL CIRCUITS IN THE SERVICE PANEL DEAD FRONT. 4- THE ENTRY WAY HAS MORE THAN 1/4 INCH VERTICAL RISE AT THRESHOLD. REFERENCE 303.2 ICC A117.1 STANDARDS. 5- UNISEX TOILET ROOM IS IN WORKING ORDER. OKAY FOR TEMP C OF O. * |
|
| 08/01/2016 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 07/29/2016 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- NOT READY FOR INSPECTION. * |