Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/14/2016 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 09/13/2016 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999 1- SHALL EXPOSE ALL PLATED TRENCHES AT TIME OF ROUGH PLUMBING INSPECTION REQUEST. 2- SHALL PROVIDE A WATER TEST AND OR FLOW TEST ON THE DWV SYSTEM DUE TO EXISTING BLDG DRAIN IS IN SERVICE. 3- THE GREEN TRANSITION GLUE IS NOT APPROVED WITHIN THE STRUCTURE. SHALL PROVIDE AN APPROVED MISSIN SPECIALTY COUPLINGS WHEN CONNECTING DISSIMULAR MATERIAL. * |