Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T16CM03123

Parcel: 141356550

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T16CM03123

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
10/28/2016 PLUMBING - FINAL Approved
10/18/2016 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999


*
10/18/2016 PLUMBING - FINAL Not ready for Inspection corrections have not been made; 2nd re-fee warning.
10/13/2016 PLUMBING - FINAL Denied IVRS - Inspection :
There is no access to the site.| 920


*
10/13/2016 PLUMBING - FINAL Denied solvent cemented fittings shall be solvent cemented.
P2609.2, 3005.2.1
10/11/2016 PLUMBING - FINAL Denied solvent cemented fittings shall be solvent cemented. C|leanout plugs shall be sealed. No piping should be visible above grade, only the plug and adaptor fitting should be seen.
10/05/2016 PLUMBING - FINAL Not ready for Inspection provide an air gap at softener drain connection to sanitary system.
Install shower drain cover.
Cut cleanouts to grade.