Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/12/2016 | ELECTRIC - FINAL | Approved | ||
| 07/29/2016 | ELECTRIC - FINAL | Not ready for Inspection | NO CHANGES MADE: 1. MAIN BREAKER IS 200A, PRINTS SHOW A 175A. 2. BACKFEED BREAKER IS 50A, PRINTS REQUIRE 45A. |
|
| 07/21/2016 | ELECTRIC - FINAL | Denied | MAIN PANEL- SOLAR BACKFEED BREAKER IS 50A, LINE DIAGRAM CALLS FOR 45A. MAIN PANEL- MAIN BREAKER IS 200A, LINE DIAGRAM INDICATES A 175A BREAKER. |