Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2016 | FIRE SPKLR - FINAL | Approved | ||
| 08/01/2016 | FIRE SPKLR - FINAL | Partial Approval | ADD HEAD IN MECH CLOSET ADD INSPECTOR TEST VALVE |
|
| 07/19/2016 | FIRE SPKLR - FINAL | Partial Approval | This is only a note. Still needs a full sprink final. This is a note for the final. Need to repair all drywall in the concealed space located in the corridor, next to the sunroom. It's in the ceiling with HVAC equipment. There is no fire final on this permit so make sure you look at this area before finaling this permit. Can also issue a separate NOV for follow up. |