Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/09/2018 | PLUMBING - FINAL | Approved | ||
| 07/03/2018 | PLUMBING - FINAL | Denied | 1- clean outs to be flush with grade 2- anti-tamper capc at condensing unit 3- white wires not to be used as hot legs 4- provide bushing at service disconnect 5- all outlets to be arcfault protected except GFCI protected per plan notes 6- kitchen counter outlet not GFCI protected 7- provide secondary drain at indoor A/C unit 8- provide means of disconnect at indoor A/C unit 9- no flexable drains allowed |