Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2017 | PLUMBING - GAS PRESSURE TEST | Approved | ||
| 06/23/2017 | PLUMBING - GAS PRESSURE TEST | Partial Approval | 1- GAS PRESSURE TEST PROVIDED. 2- THIS INSPECTION IS FOR THE GAS LINE SYSTEM FROM CORRIDOR (A) TO THE MIDDLE OF CORRIDOR (B) AND TO THE KITCHEN AND LAUNDRY AREA ONLY. |
|
| 06/16/2017 | PLUMBING - GAS PRESSURE TEST | Denied | 1- GAS SYSTEM HAS A LEAK. SHALL CHECK THE ENTIRE SYSTEM. | |
| 06/13/2017 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | ||
| 03/06/2017 | PLUMBING - GAS PRESSURE TEST | Partial Approval | 1- GAS PRESSURE TEST PROVIDED. 2- THIS INSPECTION IS FOR THE 11/4" GAS SUPPLY LOCATED IN THE CORRIDOR IN BLDG. (A)-4. |