Permit: T16CM02480

Parcel: 12109006A


Addresses:

5151 E PIMA ST

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Date Description Inspector Results Comments
06/07/2017 EXCAVATION/LAYOUT REBAR & ZON Approved
06/01/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- REINFORCED STEEL REBAR IN CANOPY COLUMNS LOCATED ON THE NPRTH SIDE OF BLDG. IS OKAY FOR CONCRETE.
02/15/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- STELL REBAR FOR THE CANOPY FOOTINGS BLDG. (A) EAST ARE OKAY FOR CONCRETE.
02/06/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- STEEL REBAR IN FOOTING FOR GENERATOR ROOM IS OKAY FOR CONCRETE.
2- STEEL RBAR FOR THE TRASH ENCLOSURE IS OKAY FOR CONCRETE.
01/10/2017 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- THE EXTERIOR CANOPY FOOTING FOR BLDG (C) ARE OKAY FOR CONCRETE.
12/29/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- STEEL REBAR OKAY FOR EXTERIOR CANOPY SECTION (A) FOUNDATINS ARE OKAY FOR CONCRETE.
12/09/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval STEEL REBAR MATS FOR THE COLUMNS F-10 AND F-11 ARE OKAY FOR BLDG. (B).
12/05/2016 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- STEEL REBAR MATS F-10 AND F-11 FOR COLUMN FOOTING IN BLDG (A) ARE OKAY FOR CONCRETE.
2- STEEL REBAR FOR MASONARY IN BLDG. (A) IS OKAY FOR GROUT.
3- DWV WATER TEST PROVIDED FOR UNDERGROUND ROUGH PLUMBING PROVIDE FOR BLDG. (C).