Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T16CM02169
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/15/2016 | FIRE - FINAL | Approved | ||
04/05/2016 | FIRE - FINAL | Denied | 1. sheet A2.0 indicates door 324A to be installed. The plans need to be changed at PDSD if this is not going to happen. 2. Corridor 324 needs an additional fire sprinkler head. Permit is required. 3. Sheet A1.0 states that an annual fire sprinkler and annual fire alarm and 5 year check valve inspections are required. Please provide copies of paperwork. 4. All ceiling tiles shall be in place at fire final inspection 5. All electrical covers shall be installed at fire final inspection |