Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T16CM01596
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/25/2016 | FIRE - FINAL | Approved | Has 15 Ft verticle clearance per approved plans. No one on site. Spoke with contractor via phone ( Carlos) and advised that they will need a lock box on the fence now that temp construction trailer is on site. Also Address needs to be displayed on address side of fence. These will need to be in place before the construction begins to go verticle. | |
03/22/2016 | FIRE - FINAL | Partial Approval | 1. Install fire department lock box on access gates to site now that trailer is on site. refrence: 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. & 3310.2 Key boxes. Key boxes shall be provided as required by Chapter 5. Closest water supply is 660 Ft on West side of Houghton. |