Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T16CM01533
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/20/2021 | STORMWATER FOLLOW-UP INSP | Approved | APPROVED | |
05/14/2021 | STORMWATER FOLLOW-UP INSP | Continued | Continued. Contractor has begun to remove large piles of material and debris. Minor track out noted. Protections in place. Additionally work within the right of way on Convento | |
12/16/2020 | STORMWATER FOLLOW-UP INSP | Continued | Continued. | |
11/05/2020 | STORMWATER FOLLOW-UP INSP | Continued | No track out. Streets have been swept. There is no grading activity at this time. Lot is being used as laydown yard for product and materials. | |
10/07/2020 | STORMWATER FOLLOW-UP INSP | Continued | Minor truck out from West entrance. | |
09/30/2020 | STORMWATER FOLLOW-UP INSP | Continued | Continued. Minor trackout noted at Southwest entrance. | |
09/16/2020 | STORMWATER FOLLOW-UP INSP | Continued | Continued. No issues at this time | |
07/30/2020 | STORMWATER FOLLOW-UP INSP | Continued | Continued. No track out or dirt in the street however some dirt on sidewalk and southern portion of the site. | |
06/02/2020 | STORMWATER FOLLOW-UP INSP | Continued | Continued. Minor track out. | |
02/06/2020 | STORMWATER FOLLOW-UP INSP | Continued | No issues at this time. Denis has a street sweeper keep the streets clean on a regular basis. | |
09/13/2019 | STORMWATER FOLLOW-UP INSP | Continued | Trackout is being swept as needed | |
07/24/2019 | STORMWATER FOLLOW-UP INSP | Continued | There was notable track out onto Cushing Street. Dennis with Lloyd construction will sweep it up as needed |