Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T16CM01533
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/22/2022 | ENGINEERING - FINAL | Approved | ||
07/21/2022 | ENGINEERING - FINAL | Partial Approval | PARTIAL IM GOOD FOR APPROVAL PENDING WITH DAVID ROBERTS.APPROVAL. | |
09/01/2021 | ENGINEERING - FINAL | Partial Approval | Partially approved. Laydown yard has been graded and temporary fence has been removed/condensed to a small portion of lot. | |
09/01/2021 | ENGINEERING - FINAL | Partial Approval | 09027. Partially approved. Laydown yard has been graded and temporary fence has been removed/condensed to a small portion of lot. | |
08/24/2021 | ENGINEERING - FINAL | Not ready for Inspection | Not ready. Contractor scraping top surface of dirt on vacant lot Used for laydown yard. Temporary fencing still in place. | |
08/20/2021 | ENGINEERING - FINAL | Partial Approval | PARTIAL OK FORTCO FOR OCCUPANCY PENDING ALL OTHER INSPECTIONS. THE CONTRACTOR STILL HAS CHAIN LINK STILL IN PLACE AT THIS TIME BUT THIS WILL BE REMOVED PRIOR TO CUSTOMERS BEING GRANTED TCO FOR THIS STRUCTURE. | |
07/29/2021 | ENGINEERING - FINAL | Continued | Continued. Laydown lot has been mostly cleared. Temporary fencing still in place. Lot will require stabilization at final | |
06/04/2021 | ENGINEERING - FINAL | Continued | Continued. Construction debris and one small pile of material remain laydown yard. Stabilization required for final approval | |
04/15/2021 | ENGINEERING - FINAL | Continued | CONTINUED AT THIS TIME. MET WITH DENNIS FROM LLOYD CONSTRUCTION TO LOOK AT SOME STEP WORK ON THE EAST SINE OF THE SOUTHERN UNIT. THERE WERE QUESTIONS FROM THEIR SUBCONTRACTOR ABOUT THE RISE AND RUN OF THE STEPS, THEY WERE REMINDED OF 4 to 7 INCHES OF RISE TO 11 INCHES ON THE RUN FOR EACH OF THE STEPS IN QUESTION. | |
07/18/2019 | ENGINEERING - FINAL | Not ready for Inspection | This was an unscheduled inspection. I spoke with the LLoyd foreman on site and requested that he asked the superintendent to start calling in inspections under his development package permit. I also reminded Loydd personnel to keep the dirt out of the streets, there is no track out protection in place | |
11/29/2018 | ENGINEERING - FINAL | Not ready for Inspection | This was a pre pre-con with Dennis from Lloyd the 471-8421 and Rodney and Cody with day Excavating. Temporary stormwater controls are in place. Swip notifications are posted. Call for inspections under your development package permit as soon as your plans and permits are approved. |