Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date |
Description |
Inspector |
Results |
Comments |
| 10/01/2019 |
PLUMBING - SEWER HCS CONNECT |
|
Approved |
Building sewer tap in new main man hole part of city main. |
| 08/14/2019 |
PLUMBING - SEWER HCS CONNECT |
|
Partial Approval |
OK into manhole. Side of manhole still needs to be patched as core was bigger than pipe. Also still need vertical section of pipe within manhole per RFI. |
| 07/24/2019 |
PLUMBING - SEWER HCS CONNECT |
|
Partial Approval |
1- Attended a pre construction meeting with the project superintendent in reference to the existing Manhole bldg. sewer tap. The ladder rungs to the existing manhole are in conflict with the advance of bldg. sewer and proposed to make an offset tap. This will require direction from the Mechanical Engineer prior to manhole tap. |