Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T16CM01533
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/11/2020 | PLUMBING - INTERMEDIATE | Approved | ||
11/12/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Partial. South portion of garage level waste and vent lines at 2 1/2”-6” lines at GL: C-D/5-6; C-G/3-4.5. | |
11/10/2020 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Not ready. Contractor cancelled, will reschedule for 12 November. | |
11/06/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Partial. Garage level (South); waste and vent lines at 2 1/2”-8” lines at GL: C-H/3-7. | |
11/04/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Room Units. 112; 113; 114; 115; 201; 211; 212; 216. | |
10/23/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Partial. Room Units 301; 311; 312; 316; 401; 411; 415. Ok to insulate and cover walls. | |
10/06/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Partial. Room Units 202; 203; 217; 218; 219; 302; 303; 317; 318; 319. | |
10/01/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Partial. Level #4; Room Units 402; 403; 416; 417; 418. | |
09/29/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Partial: Stack 5; 7; 8; 9 Room Units 120; 121; 232; 233; 325; 333; 423; 427. Restrooms 159; 160; 161; 162; 167. | |
09/22/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Partial. All the above Room Units are the same as above. | |
09/21/2020 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Not ready. Contractor cancelled all inspections for this date. | |
09/15/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Partial. Apartments: 204. 205; 224; 228; 229; 230; 304, 305; 324; 328,; 329; 330 Gas pressure test for gas line. Guage at 30 psi. RFI #284 for relocation of gas lines. | |
09/09/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Partial. Levels 1-4; Hallways at GL: B-N/3-6 | |
09/04/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Partial. Apartments 232; 233; 333; 460 | |
09/03/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Partial. Stack #13; Apartments 112; 211; 212; 216; 311; 312; 316; 411; 415. Note: RFI #175; dated 3 September; Ok to set water closets at less than 15” from vanity (13.5”). | |
09/02/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Partial. Stack #11; Apartments 114; 115; 203; 218; 219; 303; 318; 319; 403; 417; 417. Retail space #101. Stack #12; Apartments 113; 201; 202; 217; 301; 302; 317; 401; 401; 416, Retail space 101-A. | |
09/01/2020 | PLUMBING - INTERMEDIATE | Denied | Denied. Stack #11; system leaking. Stack #12; system leaking. | |
08/31/2020 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Not ready. Contractor cancelled will reschedule for 1 September | |
08/25/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Partial. Room Units: 122; 123; 226; 227; 326; 327. | |
08/19/2020 | PLUMBING - INTERMEDIATE | Cancelled | CA 1- Contractor cancelled the inspection request |
|
08/13/2020 | PLUMBING - INTERMEDIATE | Partial Approval | partial 1- This inspection is for the Commercial unit 127 and Residential rooms 120,224,22,229,324,327,328,423,427,428 only. 2- DWV water head test provided. 3- Overhead and in wall domestic water distribution is okay to cover. |
|
08/12/2020 | PLUMBING - INTERMEDIATE | Not ready for Inspection | NR 1- Work is incomplete. |
|
08/06/2020 | PLUMBING - INTERMEDIATE | Partial Approval | partial | |
08/05/2020 | PLUMBING - INTERMEDIATE | Not ready for Inspection | NR | |
08/04/2020 | PLUMBING - INTERMEDIATE | Cancelled | CA 1- Contractor cancelled the inspection request. |
|
08/03/2020 | PLUMBING - INTERMEDIATE | Partial Approval | partial | |
07/30/2020 | PLUMBING - INTERMEDIATE | Cancelled | CA 1- Contractor cancelled the inspection request |
|
07/29/2020 | PLUMBING - INTERMEDIATE | Cancelled | CA 1- Contractor cancelled the inspection request. |
|
07/24/2020 | PLUMBING - INTERMEDIATE | Partial Approval | partial 1- DWV water test provided for Stack 10 all floors. 2- Overhead and in wall domestic water distribution is okay to cover. 3- This inspection is for Commercial rooms 102,153 Stack 10 and for Residential rooms 204,205,304,305,404,405 only. |
|
07/22/2020 | PLUMBING - INTERMEDIATE | Partial Approval | partial 1- DWV Stack 5 2nd floor is okay, water head test provided. |
|
07/21/2020 | PLUMBING - INTERMEDIATE | Partial Approval | partial 1- This inspection is for Stack 5 rooms 236,3,238,435,436 Drop to add an attachment Attachments |
|
07/17/2020 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Not ready. Contractor cancelled. | |
07/13/2020 | PLUMBING - INTERMEDIATE | Partial Approval | partial 1- This inspection is for Stack #4 rooms 135,206,207,242,306,307,342,406,407,440 only. |
|
07/07/2020 | PLUMBING - INTERMEDIATE | Partial Approval | partial | |
07/06/2020 | PLUMBING - INTERMEDIATE | Not ready for Inspection | NR | |
05/28/2020 | PLUMBING - INTERMEDIATE | Partial Approval | 1- This inspection is for rooms 142,209,219,249,309,310,349,409,410,447 only. Okay to cover. Note; Plumbing DWV system rework for rooms 134,141,241,248,341,348,439, & 446 are okay to cover, DWV water test provided. |
|
05/13/2020 | PLUMBING - INTERMEDIATE | Partial Approval | Clear electric ECO Switch Gear S1 South Suite 166, and House Panel HPS1 South Level 1 only. |
|
05/05/2020 | PLUMBING - INTERMEDIATE | Partial Approval | 1- This inspection is for rooms 121,122,123,225,226,227,325,326,327,424 only. | |
03/16/2020 | PLUMBING - INTERMEDIATE | Not ready for Inspection | Work is incomplete | |
03/10/2020 | PLUMBING - INTERMEDIATE | Partial Approval | 1- Electric conductors and boxes are okay to cover rooms 209, 249, 309, 349, 409, 447 only. 2- DWV system water test provided and okay to cover in rooms 209, 210, 250, 309, 310, 350, 409, 410, 448 only. |
|
03/06/2020 | PLUMBING - INTERMEDIATE | Cancelled | ||
03/05/2020 | PLUMBING - INTERMEDIATE | Not ready for Inspection | 1- DWV water test was in the process of filling. | |
03/04/2020 | PLUMBING - INTERMEDIATE | Not ready for Inspection | 1- Contractor agreed to reschedule the inspection request due to heavy work load. | |
02/24/2020 | PLUMBING - INTERMEDIATE | Partial Approval | ||
02/21/2020 | PLUMBING - INTERMEDIATE | Partial Approval | DVW ONLY. Units 146, 254, 354, 452. | |
10/31/2018 | PLUMBING - INTERMEDIATE | Partial Approval | The construction authorization from the Pima County Department of Environmental Quality has been issued. P18SD00112 | |
10/26/2018 | PLUMBING - INTERMEDIATE | Prior to Intermediates | * PRIOR TO A COT INTERMEDIATE INSPECTION: A DEQ CONSTRUCTION AUTHORIZATION (C.A.) IS REQUIRED FOR A NEW PRIVATE MANHOLE PROPOSED OVER AN EXISTING PRIVATE SEWER PER DP/SITE UTILITY PLANS. |