Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T16CM01533
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/17/2020 | PLUMBING - ROUGH, SOIL | Approved | ||
10/16/2019 | PLUMBING - ROUGH, SOIL | Partial Approval | Storm and sanitary pvc rough , for south half of complex, ok to backfill at sw quadrant of buildings. | |
09/20/2019 | PLUMBING - ROUGH, SOIL | Partial Approval | DWV 6" from D4 to C4 | |
09/19/2019 | PLUMBING - ROUGH, SOIL | Partial Approval | Under slab supply to kitchen sink. Units 122&123 | |
09/03/2019 | PLUMBING - ROUGH, SOIL | Partial Approval | E3 to H3, E1 to H1. | |
08/26/2019 | PLUMBING - ROUGH, SOIL | Partial Approval | Roof and balcony drains for C8 to A4.5 | |
08/22/2019 | PLUMBING - ROUGH, SOIL | Partial Approval | 1- Underground rough plumbing and rain water conductors is okay for the 1st floor west between grid line H to K and between grid line 1 to 3 only. Okay to backfill trenches. | |
08/21/2019 | PLUMBING - ROUGH, SOIL | Denied | 1- Shall provide a 10 foot water head test on the systems. | |
05/20/2019 | PLUMBING - ROUGH, SOIL | Partial Approval | 1- Storm drain Underground leaders between grid line N-O from west corner of bldg east and between grid line 7-8 between M-O North to South as noted on plan. 2- Okay to cover and provide the required marking tape to be located 12 inches above pipe. |