Permit: T16CM01533

Parcel: 116206300

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
06/17/2020 PLUMBING - ROUGH, SOIL Approved
10/16/2019 PLUMBING - ROUGH, SOIL Partial Approval Storm and sanitary pvc rough , for south half of complex, ok to backfill at sw quadrant of buildings.
09/20/2019 PLUMBING - ROUGH, SOIL Partial Approval DWV 6" from D4 to C4
09/19/2019 PLUMBING - ROUGH, SOIL Partial Approval Under slab supply to kitchen sink. Units 122&123
09/03/2019 PLUMBING - ROUGH, SOIL Partial Approval E3 to H3, E1 to H1.
08/26/2019 PLUMBING - ROUGH, SOIL Partial Approval Roof and balcony drains for C8 to A4.5
08/22/2019 PLUMBING - ROUGH, SOIL Partial Approval 1- Underground rough plumbing and rain water conductors is okay for the 1st floor west between grid line H to K and between grid line 1 to 3 only. Okay to backfill trenches.
08/21/2019 PLUMBING - ROUGH, SOIL Denied 1- Shall provide a 10 foot water head test on the systems.
05/20/2019 PLUMBING - ROUGH, SOIL Partial Approval 1- Storm drain Underground leaders between grid line N-O from west corner of bldg east and between grid line 7-8 between M-O North to South as noted on plan.
2- Okay to cover and provide the required marking tape to be located 12 inches above pipe.