Permit: T16CM01533

Parcel: 116206300

Inspection Status: Approved

Inspection History: FRAMING

Date Description Inspector Results Comments
12/11/2020 FRAMING Approved
09/09/2020 FRAMING Partial Approval Partial. Levels 1-4; Hallways at GL: B-N/3-6.
09/04/2020 FRAMING Partial Approval Partial. Apartments 232; 233; 333; 460
09/03/2020 FRAMING Partial Approval Partial. Stack #13; Apartments 112; 211; 212; 216; 311; 312; 316; 411; 415.
09/01/2020 FRAMING Partial Approval Partial. Stack #11; Apartments #114; 115; 203; 218; 219; 303; 318; 319; 403; 417; 418; Retail space #101. Stack #12; Apartments #113; 201; 202; 217; 301; 302; 317; 401; 402; 416;. Retail space #101-A.
08/31/2020 FRAMING Not ready for Inspection Not ready. Contractor cancelled will reschedule for 1 September
07/15/2020 FRAMING Partial Approval partial
05/11/2020 FRAMING Partial Approval 1- Framing okay in rooms 120,121,122,123,132,133,134,135,140,141,142 only.
05/07/2020 FRAMING Partial Approval 1- Framing inspection was for rooms 406,407,435,436,439,440 & 445 only.
05/04/2020 FRAMING Partial Approval 1- Framing okay to cover in rooms 241,242,236,237,238,336,337,338,341,342 only.
04/29/2020 FRAMING Partial Approval 1- This inspection was for rooms 207,208,247,248,306,307,308,347,348 only. Okay to cover.
04/28/2020 FRAMING Partial Approval 1- This inspection is for rooms 143,209, 210,249,250,309,310,349,350 only.
Okay for sheet rock.
04/23/2020 FRAMING Partial Approval 1- This inspection was for rooms 146,148,254,255,354,355,452,453 only. Okay to cover.
04/22/2020 FRAMING Partial Approval
04/21/2020 FRAMING Not ready for Inspection 1- Contractor will reschedule inspection request.
04/08/2020 FRAMING Partial Approval 1- North Stairwell sheathing and electric is okay for the first layer of Sheetrock.
01/28/2020 FRAMING Partial Approval Electrical rooms are ok to drywall.
10/21/2019 FRAMING Partial Approval 4th floor south side.
10/14/2019 FRAMING Not ready for Inspection Need Mep intermediates in place for frame inspection.
10/07/2019 FRAMING Partial Approval 3rd floor strapping and ties complete.
09/27/2019 FRAMING Partial Approval Level 3, flooring complete.
09/24/2019 FRAMING Not ready for Inspection rained out.
09/23/2019 FRAMING Not ready for Inspection Framers have left site. Please reschedule for 24 September. Arrived at site at 1615 hours.
09/12/2019 FRAMING Partial Approval From center of elevators to north side.
08/27/2019 FRAMING Partial Approval 1- Floor nailing is okay on the second floor between grid lines 5.8 to 5 and between grid line 5.8 to 3.75 and between grid line E to G and 3.75 to 5 only.
08/15/2019 FRAMING Partial Approval 1- Second floor floor nailing is okay for bldg. A and B North and west of elevator shaft.
08/07/2019 FRAMING Partial Approval 1- Second level floor nailing is okay for bldg. A and B North and South.