Permit: T16CM01533

Parcel: 116206300

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T16CM01533

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
12/11/2020 EXCAVATION/LAYOUT REBAR & ZON Approved
06/17/2020 EXCAVATION/LAYOUT REBAR & ZON Approved
10/25/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Ramp and bike storage area at grid line 4 D.
08/01/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- Steel reinforcement okay for the Helical pads located at grid line 2 between grid lines G and H.
2- Steel reinforcement is okay for the curbs between grid lines 2 and 3 and K to H.
07/19/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- Steel reinforcement provided and okay for the Electric Room exterior wall between grid line 3- B to 3 and between grid line B- 3 to 4.
07/10/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- level 1 Curb between grid lines 7/B-61 and B.2. B4/44.5 and B/5-5.5
2- level 1 Curb between grid line 6/C-F-E.
3- Stairway wall at elevated deck between grid line C. 05, C.1/4.1-4.4
07/03/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval OK to pour short stairs at garage ramp from level 1 to level 2 and from level 2 to level 3. Complete installing rebar at stair nosings before pour.
06/24/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 2nd level of podium and NW section of retaining wall footings ok to pour.
06/21/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Ramp deck elevation 58-4" perdetails 165 & 164
Helical pads per detail 146 GL 2 from K-H.7
06/20/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Pop outs GL 8 from E-M per detail 167
Curb per detail 115 at north stairwell
06/19/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Garage ramp /elevated deck. Line 3-4, C.4 to D.2
06/18/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Curb per detail 115 GL F- G from 4-6
06/17/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection CANCELED
06/14/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Curb per detail 115 GL 7 from J-I.5 & GL 6 from J% I.5
06/13/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Curbs per detail 115 GL 7 from N-J & GL E-J from 3-6
F-4 footer GL D from 3-4
06/06/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Curb per detail 115
GL 3 -5 from J-L only
06/05/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Level one curbs OK From gridline L to N and from 3 to 5.8.
06/04/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval no new work ready today
05/28/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- Epoxy placement for rebar dowels are okay in curbs between grids N to 5.5 and between L and N and from 3 to 5.5
2- Steel reinforcement provided and okay in West ramp wall between 4-B to D.1 and level 1 to level 2.
05/09/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Steel reinforcement provided and okay from grit line 4.4 to 8 and B to E only.
05/03/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval parking garage wall from B to C on gridline 4 to elevation 54 or approximately 7’.
05/02/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- Steel reinforcement provided for vertical walls located between grid line 4.4 from D.5 to C.3 and D.5 from 3 to 4 and grid line 4 from D.5 to C.3 only
04/30/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval French drain in parking garage ok, Terracon inspected this.
04/29/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval West ramp footing per detail 122
GL 3 from B-D.5
04/17/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Elevator walls bottom lift only
04/16/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Level 1 podium deck pour GL 5-8 from 10’ south of GL I - 10’ south oh GL K.9 on,y
04/11/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval South stairwell walls up to nineties only
South elevator walls to slab height except nineties
04/09/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- Steel reinforcement provided and okay for concrete between Grid lines K.5 to N and 5 thru 8 only.
04/05/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Steel reinforcement provided and okay between Grid line K.5 to N and grid line 3 to 5 only.
04/04/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Steel reinforcement for the sub level slab is okay from column F.6 to E.2 for grid line #3 to grid and F.6 to B for 5 to 8 only.
03/28/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval remaining garage footings, and elevator wall basement level OK
03/14/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval South stairwell walls up 90’s only and south exterior elevator up to 90’s finished floor height
03/14/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval South stairwell walls up to nineties only
South elevator walls to slab height except nineties
03/13/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Column 5.6/J.1
03/12/2019 EXCAVATION/LAYOUT REBAR & ZON Cancelled
03/08/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Footer B.1/6.4
03/06/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F.6/5.6, F.6/4.6& E.9/3.6
03/05/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval 1- steel reinforcement provided for 8- column footings.
03/01/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F-1 footers H/6.4, H/5.6, H/4.6
F-1 footers I.4/5.6,I.4/4.6, I.4/3.6
F-1 footers J.1/5.6
Elevator pit per detail 104
02/28/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval Column line M.5 both columns. column line L.6 and Line K.9 three columns each on the north side. J.1 to M.5 Row 3.6 and row 4.6 four mats each Row skipping mat L6 3.6.
02/20/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval GL 5.6/J.8, K.9, L.6, M.5 AND GL 6.4/J.4, J.8, K.9, L.6, M.5 AND GL 7/J.1, I.4, I.8, K.9 COLUMN FOOTINGS OK TO POUR.
02/15/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection cancel by Dennis
02/04/2019 EXCAVATION/LAYOUT REBAR & ZON Cancelled
01/31/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval F3 footers at north stairwell
F2 footers with CW 2 walls GL N from 4.75 - 3, GL 3 from D.5 - N & GL D.5 from 3 - 3.6
01/30/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection no work
01/17/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval from 1.4 to left or south to corner B 7
01/16/2019 EXCAVATION/LAYOUT REBAR & ZON Partial Approval OK from Gridline 1.4 on 8 to stairwell garage level retaining walls.
01/15/2019 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection superintendent just wanted to meet and ask questions about required inspections scheduling and critical path