Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T16CM00986
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/06/2017 | FIRE - FINAL | Approved | Approved. Lloyd contruction is having sprink inspections next Monday. Will forward us the reports. | |
01/05/2017 | FIRE - FINAL | Partial Approval | 1) West hall second floor (2) exit lights need to have the batteries replaced/installed. 2) West hall 1st floor (1) exit light needs to have the battery replaced/installed. 3) IFC 901.6 - the fire sprinkler system is past due for the annual inspection and past due for the 5 year internal valve/ obstruction inspection. Please get these items completed by a licensed fire sprinkler contractor and have them send the reports directly to me. |