Inspection History: FIRE - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/12/2017 | FIRE - FINAL | Approved | ||
| 04/12/2017 | FIRE - FINAL | Approved | ||
| 04/11/2017 | FIRE - FINAL | Approved | ||
| 04/07/2017 | FIRE - FINAL | Partial Approval | 1) Waiting on as-builts for alarm. Acceptance test passed. See alarm permit. 2) Sprinkler final passed however need to add sprinklers in walk in coolers x 2. See sprink permit. 3) CO2 contractor will be adding 704 placards to two doors. Exterior door next to bathrooms and interior door that stores most the pumps, next to bathrooms. 4) Need to obtain operational permit, "places of assembly." This is for the subway portion. 5) Post occupant load for subway (A2) portion of bldg. |