Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/21/2018 | ENGINEERING - FINAL | Approved | ||
| 02/24/2016 | ENGINEERING - FINAL | Denied | 1) THE HANDICAP AREA IS NOT PER THE APPROVED PLANS MINOR MODIFICATIONS HAVE BEEN MADE TO THIS SITE AND WILL NEED TO BE REFLECTED ON THE APPROVED REVISIONS. 2) ON THE APPROVED PLANS IT IS NOTED ON KEYNOTE #13 THAT THERE IS EXISTING ASPHALT IN THE DRIVEWAY AREA SOUTH OF 29TH STREET. THIS IS NOT AS NOTED, THERE HAS BEEN NO PAVEMENT IN THIS AREA THAT I AM AWARE OF. I CONTACTED THE ENGINEER OF RECORD AND ASKED THAT HE GO DOWNTOWN AND MEET WITH THE ZONING AND ENGINEERING REVIEWERS AND FIGURE OUT WHAT THEY MIGHT BE ABLE TO DO TO CLEAR UP THE QUESTIONS THAT I HAVE AT THIS TIME. THE EOR HAS MADE COMMENTS TO METHAT THIS "COMMENT" WAS REQUESTED BY RON BROWN EVEN THOUGH THERE WAS NEVER PAVEMENT. I MET WITH STEVE SHIELDS IN REGARDS TO THIS MATTER AND ASKED WHAT COULD BE DONE TO RESOLVE THE ISSUES. HE ADVISED ME THAT THIS SITE WAS REVIEWED INCORRECTLY AND DOES NOT MEET THE MINIMUM REQUIREMENTS AND THE PLANS WILL HAVE TO BE CHANGED FROM A RESIDENTIAL DAYCARE TO A COMMERCIAL DAY CARE. I ADVISED STEVE AND CLAYTON TREVILLYAN THAT THE CONTRACTOR AND OWNER WILL BE CONTACTED AND ADVISED OF THE ISSUES AT THIS TIME. I CONTACED TRINNY VALENCIA AND ADVISED HIM OF THE ISSUES AT HAND, HE WILL DENIE THE SITE AS I HAVE AND WILL ADVISE THE CONTRACTOR AND THE OWNER ABOUT WHAT THEY WILL NEED TO DO TO GET THIS SITE APPROVED. |
|
| 02/04/2016 | ENGINEERING - FINAL | Not ready for Inspection | COMPLETE AS SHOWN ON THE APPROVED PLANS OR PROVIDE REVISED PLANS SHOWING NOTED CHANGES TO REFLECT WHAT HAS BEEN CONSTRUCTED IN THE FIELD. |