Inspection Status: Partial Approval
Inspection History: BUILDING PRE-SLAB
Permit Number - T16CM00577
Inspection Description - BUILDING PRE-SLAB
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/10/2017 | BUILDING PRE-SLAB | Partial Approval | LEVEL #4, AREA 4.6: MECHANICAL PADS AT GL: L - K/5 - 6.5 (2 PADS). OK TO PLACE CONCRETE (CLEAN PADS, PLACE MISSINGREBAR (NE AREA OF PAD#1). | |
12/20/2016 | BUILDING PRE-SLAB | Partial Approval | LEVEL #2; SLAB 2.6 AT GL: J/4.2 - 8, 4.2/J - N; 8/J - N, J. CLEAN AND PLACE CHAIRS - OK TO PLACE CONCRETE. | |
12/19/2016 | BUILDING PRE-SLAB | Not ready for Inspection | NOT READY R.2 CONTRACTOR CANCELLED | |
12/15/2016 | BUILDING PRE-SLAB | Partial Approval | LEVEL #9; SLAB 9.2: ENSURE REBAR IS TIED DOWN AT GL: 11/C; DOWELS AT GL: 9 - 11/G NEED TO BE TIED DOWN. OK TO PLACE COCRETE WHEN CORRECTIONS HAVE BEEN COMPLETED. | |
12/13/2016 | BUILDING PRE-SLAB | Partial Approval | LEVEL #10; SLAB #10.1: SECURE DOWELS (ABOVE HEIGHT OF POUR 6") WINDOW WASH TIE OFF BARS - BLOCK OUT HOLES IN THE DECKING (SOUTH PORTION OF SLAB): GL: D - G/ 4.2 - 7. | |
12/06/2016 | BUILDING PRE-SLAB | Partial Approval | ||
12/06/2016 | BUILDING PRE-SLAB | Partial Approval | LEVEL #5; SLAB #5.3: REBAR CORRECTIONS TO BE MADE, SEE SUND'S QC REPORT (PATRICK) BEFORE PLACING CONCRETE | |
12/05/2016 | BUILDING PRE-SLAB | Partial Approval | LEVEL 8; SLAB 8.2 AT GL: 6 - 13.5/D; 6 - 13.5/G; 10.5/B - D; 10.5 - 13.5/D; C/10.5 - 13.5; 10.5 - 12/B - C. LEVEL 4 SLAB 4.2: ELEVATED SLABS AT GL: 6.5 - 7.75/G - I.5 (3 SLABS) - OK TO PLACE CONCRETE - 4 SLABS ARE NOT READY | |
12/01/2016 | BUILDING PRE-SLAB | Partial Approval | LEVEL #4: SLAB 4.4 AT GL: G/4.2 - 8.25; 8.25/ G - J; 4.2/G - J; J/4.2 - 8.25. OK TO POUR SLAB. | |
11/30/2016 | BUILDING PRE-SLAB | Not ready for Inspection | LEVEL #4; 4.4 NOT READY: REBAR PLACEMENT INCORRECT OF ELEVATED AREAS. | |
11/28/2016 | BUILDING PRE-SLAB | Partial Approval | LEVEL #2; SLAB #2.4; GL: G/4.2 - 8.25; 8.25/G - J; J/4.2 - 8.25; 4.2/G - J. NEED TO CLEAN SLAB AREA, FINISH FORMS, SET CHAIRS. OK TO PLACE CONCRETE WHEN SLAB IS COMPLETE. | |
11/13/2016 | BUILDING PRE-SLAB | Partial Approval | GRADE BEAM AT GL: 4 - 2/ B - G. OK TO SET CONCRETE | |
11/09/2016 | BUILDING PRE-SLAB | Partial Approval | LEVEL #6 - SLAB 6.1; OK TO PLACE CONCRETE; CLEAN AREA, PLACEMENT OF CHAIRS THROUGHOUT. | |
11/08/2016 | BUILDING PRE-SLAB | Partial Approval | LEVEL #5: SLAB 5.2 ; OK TO PLACE CONCRETE AFTER CLEANING AND CHAIR PLACEMENT. | |
10/31/2016 | BUILDING PRE-SLAB | Partial Approval | LEVEL #3; SLABS 3.2 = 3.3: GL: B/7.25 -F/7.25/ 7.25 - 15.5; B/7.25 - 12; C/11.4 - 15.5; C.2 - G/15.5; OK TO PLACE CONCRETE IN PROGRESS AREAS. |