Inspection Status: Closed
Inspection History: FIRE SPKLR - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/13/2022 |
FIRE SPKLR - FINAL |
|
Closed |
PERMIT CLOSED CONTRACTOR DID NOT CALL IN INSPECTION. SYSTEM NOT VERIFIED. |
| 11/08/2017 |
FIRE SPKLR - FINAL |
|
Continued |
The two back flow preventer OS&Y valves and the Hugenot tamper switch need to be electronically supervised by the fire alarm system in the East and West riser rooms. Fire alam permit will be required. Need to add heads in the attached/adjacent electrical equipment rooms for proper coverage. |