Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - OH PIPING & HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/24/2016 | FIRE SPKLR - OH PIPING & HYDRO | Approved | ||
| 05/20/2016 | FIRE SPKLR - OH PIPING & HYDRO | Denied | cancelled. not ready. | |
| 05/19/2016 | FIRE SPKLR - OH PIPING & HYDRO | Denied | 1) Need additional strap on 1 inch cpvc just East of the attic entrance in back bedroom ( 138 sq ft) above ceiling 2) architect drawings does not show hot water heater closet in bedroom behind garage sprinkler plans were 'based on the architects drawing and no head was installed in this closet. Must have head in closet with appropriate temp rating. |