Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG PIPING FLUSH
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/31/2016 | FIRE SPKLR - UG PIPING FLUSH | Approved | called to visualize the COT water install of pipe to building #6 and stub up. May pour slab may not connect to the building riser until each stub up is flushed of debris. Must be called in as #05010 and witnessed/approved by fire. |