Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date |
Description |
Inspector |
Results |
Comments |
| 05/03/2016 |
FIRE SPKLR - UG, PIPING, HYDRO |
|
Approved |
hydro passed - 200 psi when read. Pressured up at 6 am, read at 840 am. May bury line. Still needs flush |
| 05/02/2016 |
FIRE SPKLR - UG, PIPING, HYDRO |
|
Partial Approval |
pipe only approval. Thrust blocked, joints wrapped, tracer wire in place, just need pressure test over 2 hours without pressure loss. |
| 04/27/2016 |
FIRE SPKLR - UG, PIPING, HYDRO |
|
Partial Approval |
still laying more pipe. current pipe is approved. |