Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG PIPING FLUSH
| Date |
Description |
Inspector |
Results |
Comments |
| 05/05/2016 |
FIRE SPKLR - UG PIPING FLUSH |
|
Approved |
was flushed on 4/28/16. no flush needed since connection was broke at base of riser AFF to pressure test both underground and the overhead seperately. OK to reconnect with out a reflush ( no debris around to penetrate pipe). |
| 04/28/2016 |
FIRE SPKLR - UG PIPING FLUSH |
|
Denied |
NO PRESSURE TEST PERFORMED/INSPECTION OF JOINTSJ, MUST DIG UP |