Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - UG, PIPING, HYDRO
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2016 | FIRE SPKLR - UG, PIPING, HYDRO | Approved | Piped as per plans : Tapped into an existing 3 inch main in the club house, routed over to the East side and dropped down with CPVC to copper connection. CPVP coming off off copper from building. passed hydro - 200 lbs for 2 hrs ( pumped up at 7 am , read at 9:15 am). trench is more than 36 inches. |