Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - KITCHEN EXH HOOD FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/24/2016 | FIRE - KITCHEN EXH HOOD FINAL | Approved | approved by NS | |
| 01/28/2016 | FIRE - KITCHEN EXH HOOD FINAL | Approved | Has 8 inch flame guard on fryer all nozzles are placed within the correct distances Nozzle in duct is a 2 D Wires in control box are now in a j box now has another link over the second deep fat fryer |
|
| 01/19/2016 | FIRE - KITCHEN EXH HOOD FINAL | Denied | 1) Need 8" flame guard on fryer. 2) All nozzles placed too high. 3) 2L or 2D at duct. 4) Wires in control box need to be removed. Pull into J-box. 5) Needs another link over fryer. One required per appliance. |