Inspection History Details
Inspection Status: Approved
Inspection History: SIGN SITE REVIEW
Permit Number - T15OT00089
Inspection Description - SIGN SITE REVIEW
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/23/2015 | SIGN SITE REVIEW | Approved | ISSUED PER GLENN MOYER | |
| 03/02/2015 | SIGN SITE REVIEW | Correction Required | The contractor has provided us a copy of the signed TRE as requested on 2/18/15 As the application is reviewed further we now need 1.Night view of the signage (in compliance with scenic corridor lighting) 2. NEW site plan to include: a.Must be COT stamped and approved development plan. Showing the current conditions. b.Show existing 2 non-conforming signs at the NW corner. c.On the 1st submitted (close up) site plan, we had difficulty time discerning what the various colored lines represented. Please show clearly the following (all to scale) 1.Property line (current & future) 2.Site visibility triangles (current & future) 3.Face of curb 4.Proposed sign 5.Set back 6.Fence & utility box |
|
| 02/18/2015 | SIGN SITE REVIEW | Correction Required | The following additional information/documents are required before we can continue our review of the proposed signage. We need.. 1. The name of the City of Tucson employee that agreed to the "right of way" commitment. 2. A copy of the signed TRE agreement. 3. An insurance policy showing the coverage for the signage in the TRE. Additional information may be required upon further review. |