Inspection History Details
Inspection Status: Approved
Inspection History: SIGN SITE REVIEW
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/05/2015 | SIGN SITE REVIEW | Approved | ||
| 03/03/2015 | SIGN SITE REVIEW | Approved | ||
| 01/14/2015 | SIGN SITE REVIEW | Correction Required | 1.Solar panel requires structural review. 2. Drawings require the following info added. a. scale b. sq footage c. frontage d. OAH of sign Revised drawings can be email to brian.wiese@tucsonaz.gov |