Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T15EX03585
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/14/2016 | TDOT-EXCAV GENERAL INSPECTION | Approved | This project started under Jose Cazares, When I took it over Az Pipeline was switching over services. Robert lee was the foreman on site. The only issue was 4334 e 28th backfill had settled badly. Robert repaired the settling and there are no other issues. | |
04/22/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | Met with Robert lee 247-0171 from Az Pipeline, we discussed the schedule, and I informed him that with the size of the project we will do a final walkthrough together upon completion. The construction as of now is going according to spec. |