Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/02/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Final. No Issues. |
| 05/04/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
AB passed second compaction test. Ok to Pour at 6am 5/4 |
| 05/04/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Concrete pad poured. |
| 05/03/2016 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Met with Edward to look at concrete pad area. Speedie on site to test. AB failed with 88%. Will reprocess AB and call for another inspection. |