Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 12/24/2015 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
work has been complete hot mix has been set |
| 10/16/2015 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
9/28/15 did a pre-con with david of wright construction and expressed compaction 923. and that a cold patch or hot mix will be set in place when complete. |
| 10/16/2015 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
10/15/15 inspected area and the street cuts have not been set with cold patch or hot mix, but with dirt. left a voice mail with david and made contact, that leaving dirt for a temporary fix will be ok for a day but a cold patch or hot mix has been requested. |