Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T15EX02243
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/17/2016 | TDOT-EXCAV GENERAL INSPECTION | Approved | long project which started under Jose Cazares. Patches and work check. Here is a list of patches no issues 5100 e Grant all patches excepted in eastbound lane 5210 E farness 6 x 4 patch 5245,5255,5295 E knight 4 patches in area 5350 and 5390 E erickson no asphalt repair 5003 e adams to 5069 E adams , alley work no repairs 5008 e lee to 5068 e lee, alley work small townhouses no issues 1501 to 1545 N arcadia street crossing across Arcadia no issues 1715 to 1729 N beverly small apartment complex 5x5 patch 5138 e lee street crossing 5139 e lee 8x8 patch 1815 and 1825 e beverly no patches cloverland 3x3 and 7x 10 and 3x3 5325,5343,5415 E pima alley work no issues. all addresses on list checked and approved. No issues |
|
08/16/2016 | TDOT-EXCAV GENERAL INSPECTION | Approved | This project started in 7/24/15. most of the work was inspected by jose cazarres. The patching looks good and all cleanup has been finished. No issues | |
04/21/2016 | TDOT-EXCAV GENERAL INSPECTION | Continued | large area, work in progress | |
02/19/2016 | TDOT-EXCAV GENERAL INSPECTION | Approved | inspected area and work is still in progress, NPL will need to make repairs to sidewalks and asphalt in right of way. add hot mix to asphalt and form sidewalk repairs that have been affected. |