Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
Case Number - T15DV03268
Inspection Description - INSP - FOLLOW UP CODE ENFORCE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/27/2016 | INSP - FOLLOW UP CODE ENFORCE | Approved | PORCH WAS DEMOLISHED, PHOTOS TAKEN AND IN SIRE CLOSE CASE |
|
01/21/2016 | INSP - FOLLOW UP CODE ENFORCE | Approved | The owner was going to remove the porch and now has been told that he may get assistance from the bank or someone trying to help the owner to keep the porch. Will keep the same follow up date on 3-24-16. RV. | |
09/11/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | The owner was not home and did talk to the son. Did call the owner to let him know that he is still responsible for the porch that was built before he built the house. Will be sending the letter back to the owner to let him know that he still needs to get the permit for the porch the wood frame shed and the garage converted from a carport to a garage. Will check in 45 days. RV. | |
07/06/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | The bank has called and will be assisting on the drawings and the permit on the porch on the rear of the house. Did go over that the shed in the rear yard needs to be shown on the plans for the approval. The bank is the one that sold the house or part of the sale when purchased. Will check in 60 days. RV. | |
06/11/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | Met with the owner and the draftsman has been to the property to look at the porch built on the rear of the house and the wood frame shed in the rear yard. Did go over that the shed needs to be moved to have the proper clearance. Did go over that if the shed is going to remain in the same area that the neighbors can sign off once the plans are completed and are OK where the shed is located at this time. The neighbors need to look at the plans or look at the shed and sign off if the shed is OK at the location with out moving the shed. Will keep the same follow up date on 7-2-15. RV. | |
06/02/2015 | INSP - FOLLOW UP CODE ENFORCE | Approved | Talk to the owner and still working on the drawings. He just bought the house and the rear porch was already built when buying the house. Did go over that the plans need to show where the shed is located and how the porch was built. He will call to have the plans done and hopes to have done in a few weeks. Home after 1:00 and off on Mondays. Will check in 30 days. RV. |