Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Case: T15DV03224

Parcel: 140253270


Addresses:

5885 S JEANETTE BL

Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Date Description Inspector Results Comments
06/25/2015 INSP - FOLLOW UP CODE ENFORCE Approved The trench is still opened and the owner is going to wait until he gets approval to install mobile homes on the property. The sewer line is not in use due to the neighbor has cut the line and on his own system to Randall Blvd. The owner is working on drawings to have approved for installing mobile home on the vacant portion of the property. At this time the case will be closed. Violation Abated, Close Case. RV.
05/18/2015 INSP - FOLLOW UP CODE ENFORCE Approved The new sewer line has been completed and not connected to the old sewer line any more. Will call the owner to meet on placing the caps where cut before. Permit still in applied status. Will call the owner to let him know that the permit can be issued. Will check in 10 days. RV.
05/14/2015 INSP - FOLLOW UP CODE ENFORCE Approved Talk to the owner and let him know that the sewer lines will be connected on Friday 5-15-15 in the morning but don't know the time. Will be checking on Monday 5-18-15 to check if the connection have been completed. RV.
05/08/2015 INSP - FOLLOW UP CODE ENFORCE Approved Met with the owner and gave an update of the sewer line being installed next door. The permit has been issued as of 5-6-15 and has a plumber doing the work. They are planning to do the street cut on Monday and completing it by Wednesday. Did let the owners know that the plan is to have the new sewer line connected by Friday 5-15-15 and the old line will be cut on neighbors side. Did go over that at that time the line can be blocked off on the owner side and will still have to get the permit to have the line capped. They did agree to wait until 5-15-15 and will meet again to let know that the connection has been completed. Will check on Friday 5-15-15. RV.