Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T15DV01485

Parcel: 13018077A


Addresses:

2020 S COLUMBUS BL


Inspection Status: Approved

Inspection History: INSP - INITIAL CODE ENFORCMENT

Case Number - T15DV01485

Inspection Description - INSP - INITIAL CODE ENFORCMENT

Inspection Status - Approved

Date Description Inspector Results Comments
03/01/2015 INSP - INITIAL CODE ENFORCMENT Approved EMERGENCY CALL OUT BY TFD: THERE WAS A FLOOD AT THE APARTMENT COMPLEX: BLDG 12 UNIT 428 UPPER UNIT HAS A DEFECTIVE ANGLE STOP TO THE TOILET WHICH CAUSED FLOODING TO THE ENTIRE UNIT'S FLOORING. THIS ALSO CAUSED FLOODING TO UNIT 328 THE LOWER UNIT, THERE IS DAMAGE TO THE WALLS AND CEILING DRYWALL AND FLOORING, THE ELECTRICAL DEVICES ARE ALSO AFFECTED. MAINTENANCE DID SHUT OFF THE WATER.
THE POWER WAS SHUT OFF AT THE MAIN DISCONNECT TO BOTH THE UNITS THE DISCONNECT ARE LOCATED IN THE CABINET EAST OF BLDG 12. CONTRACTOR SPECIALTY WAS ONSITE AND STARTED THE WATER EXTRACTION. PHOTOS WERE TAKEN, ALL DOCUMENTS HAVE BEEN SCANNED INTO SIRE. SCHEDULE FOLLOW UP INSPECTION WITHIN 30 DAYS