Inspection History Details
Inspection Status: Approved
Inspection History: REINFORCED MASONRY PRE-GROUT
Permit Number - T15CM08921
Inspection Description - REINFORCED MASONRY PRE-GROUT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/02/2017 | REINFORCED MASONRY PRE-GROUT | Approved | ||
01/05/2017 | REINFORCED MASONRY PRE-GROUT | Partial Approval | EAST SIDE SITE WALL OK TO GROUT TO TOP | |
11/23/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | ALL SIDES OF BUILDING OK TO TOP | |
11/22/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | EAST WALL GL1 TO 4.4 OK TO TOP 4.4 TO 6 OK TO 14'8" |
|
11/21/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 3.4 TO 4.4 FROMD TO D.3 AND 4.4 FROM D.3 TO E OK TO 14'4" | |
11/19/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | IVRS - Inspection :* | |
11/19/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | 1-3rd lift east side south to turn out ok 2-2nd lift east side from loading dock to north wall ok except opening (forklift) at north end, verts missing at jamb |
|
11/18/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | EAST WALL GL 1 TO 3.4 OK TO 8'8" SOUTH WALL OK TO TOP |
|
11/17/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | SOUTH WALL GL A TO B.5 OK TO 18'8" NORTH WALL A TO E OK TO TOP OF WALL EAST WALL OK TO 4'8" |
|
11/16/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | NORTH WALL B.5 TO E OK TO12' SOUTH WALL C TO E OK TO 12' |
|
11/15/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | NORTH WALL SECOND LIFT (8'AFF) FROM GL B.5 TO E | |
11/14/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | CMU WALLS AT 4' 8" GL: C - E/6; 6 - 4.4/E; CMU WALL AT 9' 4" GL: 1/D - C.5'; CMU WALL AT 25' 4" GL: A/5 - 3.4. OK TO GROUT PROGRESS AREAS. | |
11/13/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | CMU WALLS AT 20' - GL: 6/A - A.5; A/1 - 6; 1/A - A.5. OK TO GROUT PROGRESS AREAS. | |
11/09/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | CMU WALLS AT 14'; GL: 1/A.5 - B; A/1 - 6; 6/A.5 - B. OK TO GROUT PROGRESS AREAS. | |
11/08/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | CMU WALLS AT 4' - 8' AT GL: 1/B.5 - A; A/1 - 6; 6/A - B.5 OK TO GROUT PROGRESS AREAS. | |
11/07/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | CANOPY FOOTINGS AT GL: .5A/ 5 - 5.75. OK TO POUR FOOTINGS. | |
11/02/2016 | REINFORCED MASONRY PRE-GROUT | Partial Approval | GRID LINE A FROM 1 TO 6 OK TO 4' | |
11/01/2016 | REINFORCED MASONRY PRE-GROUT | Not ready for Inspection |